Wall lining system in Terminal 2 at Manchester Airport
MICAM provided, built and installed the wall lining system and associated fixtures for the Terminal 2 at Manchester Airport.
MICAM provided, built and installed the wall lining system and associated fixtures for the Terminal 2 at Manchester Airport.